|
|||
PFPB 2436 - Commercial Construction and Fixture SettingPractices and procedures employed by a plumber in the common construction of a commercial building including drain, waste, and vent systems, water systems, and fixture installations. Semester Hours: (4- 3 -3) CIP: 46.0503
|
|||
All publications © 2024 St. Philip’s College. Powered by the Acalog™ Academic Catalog Management System™ (ACMS™).
|